Steelworks

News

28-07-2010GLASSTEC 2010

Glasstec Glass Industry Fair 2010, will take place from September 28 to October 2, 2010 Read More »

20-05-2010"MIR STEKLA" FAIR 2010

The International Exhibition "The World of Glass", which is held annually at the Exhibi Read More »

02-03-2010METEF-FOUNDEQ FAIR 2010

We will be exhibiting at METEF-FOUNDEQ 2010 in Brescia Read More »

Manpower and high-tech at work

Which requirements should a ferro-alloys and additives system in the steel metallurgical process to the electric furnace have today?

  • High quality accuracy in dosing and weighing ferro-alloys and additives.
  • Fast distribution to the final destinations in the fusion and refining process, within the shorter required tap-to-tap time.
  • Reliability of automation system and security working conditions control.
  • Cleanness and high reduction of material losses, to save material consumption, maintenance and cleaning costs.
  • High level of automation and supervision (level 1 and and process data reports.


Rely on our long experience!

 

An industrial plant requires perfect performance of each individual item, so SV Impianti poses the greatest attention in both the planning stage as in the production of every single machine, to offer customers innovative solutions able to meet the most stringent requirements in terms of functionality and reliability.
Deepen the features of our ladle furnace equipment and discover the characteristics of all the products inside the online catalogue

Ask for Informations

SHOWCASE

© Copyrights SV Impianti P.I. 02484570276